My sperm counts are ok and my wife's ovulation is also normal but I possess arteriogenic impotence due to which the erection doesn't last long and leads to unsuccessful penetration. Is it possible for us as a couple to have a baby through ivf or any other means?
Ask Free Question
Hello- arteriogenic erectile impotence is erectile impotence caused by insufficient arterial blood supply to the cavernous bodies regardless of the arterial disease or abnormality responsible for the insufficiency. Blood carries nutrients and essential blood cells to all parts of the body. Without blood, there can be no life, and without blood flow, there can be no erection. Some men lack proper blood flow in the penile tissues, causing a sudden-always unwanted-lack of erectile capacity. Most men who suffer from poor blood flow also combat venous leaks that prevent the penis from holding enough blood to power an erection. If looking for a permanent recovery then ayurveda is the answer as, alkaloids, flavonoids, mucilage, saponins, tannins and bioactive phenols found in the ayurvedic herbs improve erectile quality and can provide permanent recovery from venous leakage induced erectile dysfunction.
Take help from the best doctors
Ask a free question
Get FREE multiple opinions from Doctors